DETAIL 5/2022

DETAIL 5/2022

Prefabrication and Modular Construction

$31.00 incl. 0% VAT Excl. shipping
Prices include VAT. Depending on the delivery address, the VAT may vary at checkout. "Find out more."
[...]
IconArrowChevronDown icon
NOTICE ITEM
Availability:

In stock

Shipping:

$7.00

Languages:

German / English

DETAIL 5/2022

Prefabrication and Modular Construction

From the editorial DETAIL 5/2022

Modular Construction

Even before the most recent German parliament elections, it was clear that a lot more space was needed due to the many overhang seats resulting from the country’s proportional representation system. But where could all the new delegates and their staff go? There was little time to erect a new building and ­ambitious efficiency and sustainability targets to meet. The answer is Luisenblock, a seven-story building accommodating 400 delegates in the nation’s capital of Berlin. Thanks to its modular design, planning and construction took only two years. Designed by Sauerbruch Hutton, the flagship office building opened its doors in December 2021. Not only did it stay within its 70 million euro budget, its sustainability concept includes a “woodcycle” component: the 2,500 m3 of wood used for construction will be offset by planting an equivalent amount of new trees.

The building on Berlin’s Spree River is one of many compelling modular construction examples presented in our May issue. We document outstanding examples worldwide with their diversity of materials, structural details, and building typologies.

On 19 May, we’ll delve into the topic at our Modular Construction Congress – join us at the conference on site in Frankfurt am Main or digitally: detail.de/modulbau

 

  • May
  • 2022
    • German / English